1. Put the base A on a level surface and lock the rear
castors B.
2. Loosen the mast knob C, but leave it screwed into the
base A.
3. Insert the tube of the mast D into the hole of the base
A.
4. While supporting the mast assembly D, tighten the
mast knob C.
5. Place the leg spreader handle E onto its support F
and push the spring pin, to lock the handle E on its
support F.
Installing the actuator or hydraulic pump to the boom
2 x 17 mm wrench
1. Loosen the nut A and remove bolt B from the boom
mounting bracket C.
2. Place the actuator D or hydraulic pump E in the boom
mounting bracket C and align the holes.
3. Reinstall the bolt B and tighten the nut A.
1551341-E
Wiring
(Kirilos and Atlante Electric only)
1. Plug the hand control cable on socket A and motor
cable on socket B control unit.
2. Place the battery C on the control unit. Push the top
of the battery against the mounting bracket until there
is an audible click.
4.3 Disassembling the Lift
1. Put the base on a level surface so that all castors make
contact with the floor.
2. Lock the rear castors.
3. Reverse the relevant steps of the assembling procedure
for your model.
Setup
13