Electrical Installation - Vetus CCFB Manuel D'utilisation Et Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
• The instrument can be built in
to an instrument panel or into a
partition of any thickness.
Screws to be used: self-tap-
ping screws ø 2.9 mm.
Maximum length of screws: 10
mm + thickness of the panel.
The instrument can be built
into a partition of up to about 8
mm
thickness
screws supplied.
• There must be free space of at
least 35 mm behind the panel
to allow for installation and any
necessary maintenance.
• Use the template to drill holes
in the instrument panel or par-
tition. Use 2 screws to fit the
instrument. Make sure that the
gasket
is
fitted
between the instrument and
the panel or partition.

3.3 Electrical installation

See page 32 for the wiring diagram.
Fit a 0.5A fast fuse in the plus (+) wire. Do not use the starter batteries to provide power
to the instrument.
Position the instrument at the following minimum distances as shown:
- 30 cm from a compass
- 50 cm from radio equipment
- 2 metres from a transmitter
- 2 metres from a radar
Chain counter CCFB
using
the
properly
ENGLISH
7
060124.01

Publicité

Table des Matières
loading

Table des Matières