INSTALLATION | GUARANTEE | ENVIRONMENT AND RECYCLING
14.2 Wiring diagram
1/N/PE ~ 230 V
6
5
4
3
1 ON/OFF indicator
2 Mains terminal
3 Earth conductor
4 Safety temperature controller
5 Heating element
6 Temperature limiter
14.3 Heat-up table
The heat-up period depends on the amount of water, degree of
scaling and residual temperature. For the heat-up time for a cold
water supply of 10 °C and a maximum temperature setting, see
the following table.
Content
l
Approx. heat-up time
min
www.stiebel-eltron.com
1
2
N L
1
2
3
4
3
6
9
12
14.4 Data table
Hydraulic data
Rated capacity
Electrical details
Connected load with ~ 230 V
Rated voltage
Phases
Frequency
Application limits
Available temperature range
Max. permissible pressure
Max. throughput
Versions
IP-Rating
Open vented type
Container material
Material, tap body
Colour, tap casing
Dimensions
Height (from the centre of the water
connection)
Width
Depth
Length of connecting cable
Weights
Weight (dry)
Weight (wet)
Guarantee
5
The guarantee conditions of our German companies do not
15
apply to appliances acquired outside of Germany. In countries
where our subsidiaries sell our products a guarantee can only
be issued by those subsidiaries. Such guarantee is only grant-
ed if the subsidiary has issued its own terms of guarantee. No
other guarantee will be granted.
We shall not provide any guarantee for appliances acquired in
countries where we have no subsidiary to sell our products.
This will not affect warranties issued by any importers.
Environment and recycling
We would ask you to help protect the environment. After use,
dispose of the various materials in accordance with national
regulations.
EBK 5 G
EBK 5 GA
074286
074287
l
5
kW
2
V
230
230
1/N/PE
1/N/PE
Hz
50
°C
35 - 100
35 - 100
MPa
0
l/min
10
IP24
IP24
X
Glass
Glass
Brass
Brass
white
chrome finish
mm
325
325
mm
245
245
mm
242
242
mm
750
750
kg
3,5
kg
8,5
EBK G | EBK GA |
23
5
2
50
0
10
X
3,5
8,5