16
REPORTS
16.1 INSTALLATION AND FINAL ACCEPTANCE REPORT FOR THE CLIMBING
PROTECTION DEVICE
(Part 1, retained by the operator)
Building/structural equipment
Address:
Remarks:
Sold-to party
Name:
Address:
Installer
Name:
Address:
Climbing protection system
Manufacturer:
Model/type:
Serial numbers:
Mounting type:
Anchor:
□
Injection anchor:
connection:
□
Checklist:
Substrate as expected (no doubt about the bearing capacity)
Proof of bearing capacity is available
Installation performed according to the
installation instructions from the system manufacturer
Connection systems installed according to the
specifications of the respective manufacturer
Only corrosion-proof fasteners were used
All fittings photographed showing their number plate
Installation drawing stored on site
Identification label(s) is/are present and attached
Pretension correct (only for cable systems)
System is free of debris and the runner moves freely
Runners handed over to the operator
A test ascent was carried out and the test was passed
System has been installed and handed over free of defects
Installation and operating instructions are complete and
have been handed over to the operator
Additional information
Comments from head installer:
MAT-MA-0035_GB SKYTAC
Order No.:
Type of building:
Contact person:
Tel.:
Head installer:
Tel.:
□
Screw anchor:
Machine bolts:
□
Version as of: 13/02/2018
□
Clamped
yes
no
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
page 34 of 37
n/a
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨