Preparations; Boat Rack Assembly - Reely Hydro Force Notice D'emploi

Modèle réduit de bateau électrique
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8.

Preparations

The model ship „Hydro Force" is delivered ready for operation. Only a few steps, such as installation of the drive
battery and placement of the receiver aerial are required for commissioning.
Before completing the model or taking it into operation, read each section carefully. The construction stages
are almost always illustrated for better understanding.
Only carry out the steps described in the different sections if you have completely understood the procedure
and know exactly what to observe.
a) Boat Rack Assembly
The scope of delivery includes a boat rack of wood that has to be assembled and glued together first.
Build the boat rack (consisting of the four wood parts) as shown in figure 1.
The side parts (figure 1, item 1) must be put on the table so that the wide side points down. The side parts are then
attached into the long parts (figure 1, item 2).
Glue the wood parts on with a drop of viscous instant adhesive or some 5-minute epoxy resin glue. For the further se-
tup, maintenance work and when the model is not in use, we recommend always putting the boat on the boat stand.
36
Figure 1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1277994

Table des Matières