Tecno-gaz STERILAIR 3000 Mode D'emploi page 26

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STERILAIR 3000 : WALL – INSTALLATION
1)Read carefully the manual to verify the equipment's ideal position before starting to use the drill
2) NB: the wall-installation, possibly in vertical position at about 110 cm from the ground, assures the
ideal local conditions.
3) Place the installation template in the position you have chosen on the wall : the middle holes must
be parallel to the floor.
4) For the vertical wall-installation pierce the template in the points corresponding to the holes marked
with "A" to fix their position on the wall and then remove the template.
5) Drill holes in the points you have marked and then insert the supplied --------into the holes.
6)Insert the supplied screw leaving an opening of 3/4mm from the screw's head to the wall.
7) Now place STERILAIR 3000 on the screws, hang it up on the screws' head and let it
slide until it reaches the right position. Make sure that STERILAIR 3000 is held up tightly by the
screws.
8) Once STERILAIR 3000 is in the right position, tighten the screws.
THANK YOU FOR YOUR CHOICE
4.3
DEMOLITION – DISPOSAL
Do not dump the machine in unauthorized dumping ground, consign it to disposal companies.
Disposal must be carried out in accordance with the laws of the country where the machine is
used or by means of specialized companies. The equipment consists of plastic, metallic,
electromechanical and electronic components and of U.V. discharge tubes.
24
DSAF078_REV2.doc

Publicité

Table des Matières
loading

Table des Matières