AVG AVI-366IS – IOWA Instructions D'installation Et Guide De L'usager page 23

Hotte îlot
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLING THE UNIT (continued) 
 
 
 
 
Step 4: 
Put the inner duct cover and the outer duct lid on the hood box.  
 
 
 
 
 
Figure 4
 
 
 
Step 5: 
Depending on the position of the screws on the upper support 
frame,  drill  4  holes  (about  φ  8  mm)  and  place  the  expansion 
rubber  in  the  holes.  Aim  the  holes  to  the  ceiling,  attach  the 
ceiling cover with the expansible screws and tighten firmly. 
Figure 5
 
 
Step 6: 
Place the top support frame on the ceiling. Use 4 M4X10 screws 
to attach each top bracket to the ceiling cover. 
Figure 6
 
 
 
Step 7: 
Lift the complete hood so that the bottom support frame covers 
the top support frame by adjusting its height to the position you 
marked.    Secure with 4 M4x10 screws and tighten securely. 
 
 
 
 
 
Figure 7
 
    24 

Publicité

Chapitres

Table des Matières
loading

Table des Matières