Panel And Functions Of The Nxt1 L'automatica - Nemox GELATO NXT1 Mode D'emploi

Masquer les pouces Voir aussi pour GELATO NXT1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
NXT-1 AUTOMATIC is designed to operate fully automatically. Below are the details of all functions:
Function
Operation
The machine starts
TAP L.1
with pre-cooling.
1 x 2"
Automatic operation.
Machine starts
TAP L.1
without pre-cooling.
1 x 2" +
Automatic operation.
1 TAP L.1
ENGLISH
Description
Press and hold the START L.1 key for two
seconds.
Start the automatic cycle (see paragraph
MAKE ICE CREAM WITH NXT1 L'AUTOMATIC).
At the beginning of the cycle, the machine
performs a pre-cooling, during which the
blade does not mix the ingredients.
After the pre-cooling period, the production
phase starts automatically.
The TIME LINE bar gradually lights up.
The blade starts signalling with 2 beeps.
When the ice cream is ready, the machine
automatically switches to the storage phase.
WARNING: Storage lasts up to 8 hours. After
this time, the machine will turn off
automatically. 5 beeps signal the turning
off.
Press and hold the START L.1 key for two
seconds.
Then press the START L.1 key again and the
production phase will start immediately.
When the ice cream is ready, the machine
automatically switches to the storage phase.
WARNING: Storage lasts up to 8 hours. After
this time, the machine will turn off
automatically. 5 beeps signal the turning
off.

PANEL AND FUNCTIONS OF THE NXT1 L'AUTOMATICA

Led and sound
Starting the pre-cooling cycle:
- Led L.1 on
- Turn on: audible signal (1 beep)
Starting the production phase:
- Led L.1 turned on
- Led L.2 on the TIME LINE bar light up gradually
- Blade start: audible signal (2 beeps)
Beginning of the storage
- Led L.1 turned on
- Led L.2 TIME LINE all turned on
- Led L.3 storage key turned on
- Led L.4 DENSITY CONTROL turned on
- Storage start: audible signal (3 beeps)
Reaching the time limit:
- Machine turned off: audible signal (5 beeps)
Start of cycle and production phase
- Led L.1 turned on
- Audible turn on: audible signal (1 beep)
- Led L.2 on the TIME LINE bar light up gradually
- Blade start: audible signal (2 beeps)
Beginning the storage
- Led L.1 turned on
- Led L.2 TIME LINE all turned on
- Led L.3 storage key turned on
- Led L.4 DENSITY CONTROL turned on
- Storage start: audible signal (3 beeps)
Reaching the time limit
- Machine turned off: audible signal (5 beeps)
PAG. 06

Publicité

Table des Matières
loading

Table des Matières