Electrical Installation - Afnor Model - Bodet Time Profil 750 Manuel D'installation Et De Mise En Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN

2.1.2.2 Electrical installation - AFNOR model

- With lighting option: feed the first mains cable through the left-hand cable gland then connect
1
this cable to the terminal block
in the N-L-
terminals reserved for lighting
,
- Feed the second mains cable through the right-hand cable gland then connect this cable to the
terminal block
in the N-L-
terminals reserved for the circuit board
,
1
(The two mains cables must come from the same building),
- Attach these cables to the fixing plate with cable retainers
,
- Feed the synchronisation power cable through the smallest central cable gland,
- Connect this cable to the circuit board via the terminal block stencilled AF
,
2
You do not need to observe any correct polarity.
- Connect the emergency battery cable (if present) to the circuit board
3
,
- Clean the seal and then apply silicone oil on it,
6
4
1
2
1
2
5
3
4
- Realign the front face to reconnect the ribbon cable
between the circuit board
and the movement
on the front face,
5
- Limit the length of the cable by passing it through the cable clip
in order to avoid shading in
6
the case of the lighting option (contact of the cable with the dial once the clock is closed),
- Close the clock by placing the front face back in its original position,
- Tighten the four cover screws (1,2 Nm),
- Replace and tighten the air inlet screw (15 Nm) on the underside of the clock.
24

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Profil 760

Table des Matières