Installation; Pre-Requisit; Single Sided (Sf) Clock - Bodet Time Profil 960 Manuel D'installation Et De Mise En Service

Horloge intérieure
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

II

- Installation

2.1 Pre-requisit

Choose a location where to install the clock, preferably away from sources of electrical interference,
such as transformers.
Installation and maintenance of this equipment must be carried out by qualified personnel.
The clock is connected to the Ethernet (PoE) data network. The equipment must be installed in
compliance with standard 802.3af, class 3.
2.2 Single sided (SF) clock / ref.: 933D11, 933D21, 933D31
1) Drill the support to the required dimensions.
2) Place the 2 screws Ø6 (1) with their washers.
3) If necessary, carry out the various connections (see chapter power supply and setup and initial
time setting).
4) Hang the clock and screw it with a size 10 flat key.
EN
5

Publicité

Table des Matières
loading

Table des Matières