Installation Steps; Electrical Preparation - Scrigno OPEN 2.0 Antamatic Manuel D'utilisation

Kit d'automatisation pour portes coulissantes interieures
Masquer les pouces Voir aussi pour OPEN 2.0 Antamatic:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EN

INSTALLATION STEPS

The motor must be installed in the rail head where the door opening upright is located.
G
Remove the door, the hangers and the upright (if fitted), before starting to install the kit
Motor

ELECTRICAL PREPARATION

H
Caution: the electrical preparation operations must
only be performed by skilled personnel
Position the junction box in an accessible position, in the
door closing upright area, making sure that the motor
cable length is sufficient.
The cable may not be extended or spliced!
Note: The cable outlet position may differ from the one
shown alongside.
1
2
Remove the rear block.
Motor cable
OPENING
CLOSING
Radar detector (optional)
Electronics
MOTOR CABLE INLET
PG CONNECTOR for BUTTON
CABLE (not supplied)
230V POWER CABLE
1a
DOORTECH version:
Remove both blocks and replace them with
those for the Doortech version.
Fit the front block back on.
R1387
Open
2.0
Pushbuttons
(optional)
230V
Bipolar
Switch
DCM2461/SCRIGNO - OPEN2.0
| pagina 53

Publicité

Table des Matières
loading

Table des Matières