8.8 Indirect Storage Tank
Boiler 1.48 GA can be electrically connected to indirect storage tank as follows:
• Connect DHW priority 10k Ω sensor NTC to terminals 9-10 on terminal block M2.
• Insert 10k Ω NTC sensor element in the sensor well of indirect storage tank.
• Verify exchange capacity of the storage boiler coil is appropriate for boiler power.
• Adjust DHW temperature +95 °F...+140 °F (+35 °C...+60 °C) by pressing
•
IMPORTANT: set parameter P03 = 05 as described in: "PARAMETER SETTINGS".
Sensors used for this boiler are proprietary to the manufacturer. Use of after market sensors will
diminish boiler performance.
FIGURE 8-7 Kt Indirect Storage Tank
B
A
NOTICE
C
D
E
10K Ω Sensor
G
A
Heating system
B
Three way diverter valve
C
Heating water flow
D
Heating supply to DHW indirect storage tank coil
E
Heating water return
F
Tank
G
Optional 10k Ω DHW priority sensor tank
37
240012485 REV A [12/30/2018]
on boiler Control.