Installation and maintenance instructions
EN
Installation and adjustment instructions
Professional installation of the door unit
1.
Insert the frame into the wall opening.
2.
Align vertically and horizontally and fasten (wedges,
mounting cushions etc.).
3.
Mount the sash and perform locking test while aligning
the frame with the sash until the gasket rests evenly
and circumferentially against the sash.
4.
Install the frame in the masonry with suitable fixing
material, assure compression-proof backing in the
hinge and locking points areas.
5.
Perform sealing measures as necessary:
-
Recommended: Installation according to "Guideline
for installation of windows and external doors" by
Gütegemeinschaft RAL.
6.
After hardening of the sealants, adjust the door sash at
the hinges and perform final locking and functions test
of all components.
7.
Submit the documentation (operating and
maintenance instructions acc. to CE certification) to
the customer.
Explanation
Compression-proof backing
Fasteners coordinated with wall material
Aug. Winkhaus GmbH & Co. KG ∙ Berkeser Straße 6 ∙ D-98617 Meiningen ∙ T +49 3693 950- 0 ∙ www.winkhaus.de ∙ Subject to technical changes
panicLock AP4
24
5083118 / 03 / 2021