D
A
B
C
3
Fig. 13: Wall mounting
key
1
Screws for mounting (4x) [SW 13 / ]
2
Fastening anchors [S12-Ø12 mm / 25 mm ]
A
Minimum clearance: 486 mm
Recommended clearance: 735 mm
B
Recommended clearanced: 1000 mm
C
Minimum clearance: 500 mm
D
Minimum clearance: 300 mm
Recommended clearanced: 1000 mm
10.4.1
Requirement for supply lines and fuse
DC-Seitig
Max. conductor cross-section
Min. cable cross-section
Length of insulation to be stripped off
Recommended cable type
Connection type (brand and model for connector)
Combiner box
AC-side
Max. conductor cross-section
Min. cable cross-section
Cable diameter for cable fitting
Length of insulation to be stripped off
Cable lug Ø connection bolt
Tightening torque
Connection type
Cable lug dimension w - maximum width
Ground conductor connection
Ground conductor connection tightening torque
Fuse protection for installation provided by customer (max out-
put overcurrent protection)
Fitting for AC connection
Torque for cable fitting
36
Option: 50 mm² with 2x5 AC cable. The optionally available input plate is required for this! Accessories [See sec-
tion 10.4} Page 192]
B/ M/ MF/ L
8 mm
676 mm
1
2
A
max.
20 mm
12 mm
Fig. 14: Minimum clearances for wall mounting
3
4
1)
1)
-
-
-
908 mm
1543 mm
486 mm
Bolt with lock nut (2x)
U-lock (not in scope of supply)
Minimum clearance excluding device: 500 mm
Recommended clearance excluding device: 766,5
mm
-
-
-
-
6 mm²
2.5 mm²
15 mm (see insert in scope of delivery)
in accordance with local installation standards
Phoenix adapter/ PV-C3F-S 2.5-6 (+) 1100V/35A
Phoenix adapter/ PV-C3M-S 2.5-6 (-) 1100V/35A
yes
240 mm² (AL or CU)
36
50 mm² (AL or CU)
16 - 28 mm
Depending on the cable lug
Bore for M10 screw
30 Nm
Cable lug (use the appropriate cable lug depending on
the cable material!)
42 mm
M10
10 Nm
500A
M40
10 Nm
300 mm
486 mm
Page 193