CORRECT
PLASTIC TIE
5/8"
(15mm)
PLASTIC TUBE
DETAIL A
Reinstall the coil assembly along with bracket(s)
that secure(s) it. Failure to reinstall the brackets will
result in capacity loss and condensation formation
inside the cabinet. Reconnect the waterproof con-
nector inside the coil section.
Refer to 9.3. Step 1 to 3 in reverse order to reas-
semble the panels. Ensure the proper knockouts are
removed for drainage and electrical connections.
NOTE
For Horizontal installation an auxiliary drain pan
must be installed.
9.3. Horizontal left installations
For horizontal left installation, the drain pan will
need to be moved to the opposite side of the coil.
This can be done by moving the two brackets and
drain pan to the left of the coil. This way, the con-
densate that formed on the coil will fall into the drain
pan. Also, the appropriate knockouts for the drains
will need to be removed once the drain pan is in
its correct position. In addition to relocating the side
drain pan, the fan assembly will also need to be re-
moved rotated 180°, and reinstalled. The motor has
to be closest to the ground. The two clear plastic
tubes included in the accessory bag will also need
to be attached to the top drain pan. See instructions
below.
Directions for rotating fan for Horizontal Left In-
stallation:
Specifications are subject to change without notice.
SVZ-KP12, 18, 24, 30, 36NA
INCORRECT
PLASTIC TIE
PLASTIC TUBE
Step. 1 Remove the panel marked "FILTER".
14
Electrical knockouts
Air ow
IMPORTANT
Horizontal Right Installation
Fan assembly rotation not required
© 2024 Mitsubishi Electric US, Inc.
Primary drain
3/4" FPT
Auxilliary drain pan