Dual side return seal bottom
of air handler add 2 filters →
→ →
9.2. Horizontal right installations
Refer to section 9.3., Horizontal Left Installations,
step 1 to 3 & 8, for removing the entire coil assem-
bly from the air handler cabinet. This will require
removing the Filter, Blower and Coil Panels along
with the bracket(s) that secures the coil assembly.
Be sure to to disconnect the waterproof connector in
order to remove the coil from the cabinet.
Once the coil is removed, the two clear plastic tubes
included in the accessory bag will need to be attach-
ed to the top drain pan. First, remove the lower rub-
ber plugs in the top drain pan. Next, install the clear
plastic tubes which are included in the accessory
bag. Ensure the plastic tubes drain into the pan.
Also, be sure the clear plastic tubes do not have any
restriction. Cutting of the plastic tube is required,
please refer to the table below for length. Finally,
secure the clear plastic tubes to the top drain pan
per Detail A then to the metal brackets supporting
the coil to the top drain pan with the provided plastic
ties as shown.
Specifications are subject to change without notice.
SVZ-KP12, 18, 24, 30, 36NA
Model code
12, 18, 24
30, 36
1
Tube length provided
13
↑ ↑ ↑
Single side return (for 12, 18,
and 24 ONLY) seal bottom of
air handler add filter
Plugs
DETAIL A
Secure plastic ties,
2 per side
2 plastic tubes.
Ensure tubes drain into pan
Tube Length
4.9 in. (125 mm)
1
6.9 in. (175 mm)
© 2024 Mitsubishi Electric US, Inc.