Preliminary operations
Fit junction boxes and corrugated tubing needed for the incoming connections from the distribution pit.
The number of tubes depends on the type of system and the accessories you are going to fi t. You need to set
up at least two corrugated tubes where the operator will be installed (
Checking measurements and applicative dimensions
Establish where you will fit the gate brace and measure where the gate-post brace will fit. Make sure to respect
the quotas shown in the drawing and table.
POST BRACE
A
150 min
310 max
*
GATE BRACE
B
*
on the gate leaf that opens fi rst).
Leaf opening arc (°)
90
90
110
322
330
A
B
C max
140
420
160 ÷ 180
380
200 ÷ 220
400
150
150
50