Télécharger Imprimer la page

mundoclima Aerotherm BCC 200 CONNECT Manuel D'installation, D'utilisation Et D'entretien page 98

Masquer les pouces Voir aussi pour Aerotherm BCC 200 CONNECT:

Publicité

Before starting work, verify that the sectioning
device at the start of the unit power line is
open, blocked and equipped with sign warning.
First create the earthing connection.
After wire connection, check it again and make
sure the correctness before power on.
Prior to powering the unit ensure that all the
protections that were removed during the
electrical connection work have been restored.
Signal lines/data-lay
Do not overpass the maximum power allowed,
which varies, according to the type of signal.
Lay the cables far from power cables or cables
having a different voltage and that are able to
emit electromagnetic disturbances. Do not lay the
cable near devices which can generate
electromagnetic interferences.
Do not lay the cables parallel to other cables;
cable crossings are possible, only if laid at 90°.
Connect the screen to the ground, only if there
aren't disturbances .
Guarantee the continuity of the screen for the
entire extension of the cable.
Respect impendency, capacity and attenuation
indications.
Modification
All unit modifications will end the warranty
coverage and the manufacturer responsibility.
Breakdown/Malfuction
Disable the unit immediately in case of
breakdown or malfunction.
Contact a constructor certified assistance service.
Use original spares parts only.
User training
The installer has to train the user on :
ON / OFF
set points change;
1
SAFETY CONSIDERATION S

Publicité

loading