: Fastening the carrier section (MSP-MTP, 10)
5.2
1. Bring the carrier section (MSP-MTP, 10) into place on the longitudinal channel
(MSP-AL-LC, 17), prefix one wing clamp (MSP-AL-WH, 11) on each intersec-
tion between carrier section (MSP-MTP, 10) and longitudinal channel (MSP-AL-
LC, 17) and align them. Two wing clamps (MSP-AL-WH, 11) which are fixing one
Fig.
: Fastening the carrier section (MSP-MTP, 10)
5.3
1. For the first and the last panel mounted on the table, three carrier sections (MSP-
MTP, 10) must be used.
Figs.
,
: Mounting framed PV panels
6.1
6.2
1. The installation instructions issued by the panel manufacturer must be observed.
2. Position the first end clamps (MSP-EC, 20) at the ends of the carrier section
(MSP-MTP, 10).
3. Place the PV panel on the carrier sections (MSP-MTP, 10) and slide it into the
end clamps (MSP-EC, 20).
4. Align the PV panel correctly and then tighten the screws in the end clamps (MSP-
EC, 20) securely to a torque of M
5. Fit the middle clamps (MSP-MC, 22) into the carrier section (MSP-MTP, 10), slide
them into position against the PV panel which is already in place.
6. Place the next PV panel on the carrier sections and slide it into place under the
middle clamps (MSP-MC, 22).
Figs.
,
: Mounting thin-film PV panels
7.1
7.2
1. The Hilti solar park installation system is suitable for use with thin-film PV pan-
els. The installation instructions issued by the panel manufacturer must be
observed. The panels are laid out in horizontal format.
2. Fit the panel end clamps (MSP-TF-EC, 21) into the carrier section (MSP-MTP,
10) and tighten the screws slightly using a 6 mm bit or hex key so that the nut
turns through 90°.
3. Position two middle clamps (MSP-TF-MC, 23) on the upper horizontal edge of
the thin-film panel.
4. Guide the lower edge of this prepared thin-film panel into the panel end clamps
(MSP-TF-EC, 20) on the carrier section (MSP-MTP, 10)
5. Fit the middle clamps (MSP-TF-MC, 23) on the top edge of the panel into the car-
rier section (MSP-MTP, 10) and tighten the screws slightly using a 6 mm bit or
allenkey so that the nut turns through 90°.
6. Align the panel correctly in its final position. Tighten the end clamps to a torque
of M
= 15 Nm using a 6 mm bit or allenkey.
d
7. Position two middle clamps (MSP-TF-MC, 23) on the upper horizontal edge of
the thin-film panel.
Fig.
: Fastening the cable holders
8
The cable holders (MSP-AL-CH 8, 24) are fitted in the grooves in the sides of the
longitudinal channels (MSP-AL-LC, 17). Insert the cable holders (with the clips hor-
izontal) in the groove in the side of the longitudinal channel (MSP-AL-LC, 17) and
Printed: 01.04.2014 | Doc-Nr: PUB / 5176385 / 000 / 00
= 15 Nm using a 6 mm bit or hex key.
d
carrier section, must be positioned on the opposite sides of the carrier section
diagonally to each other
2. Fasten the wing clamps (MSP-AL-WH, 11) at each intersection. Use a 6 mm bit
or hex key to tighten the screws to a torque of M
2. For the panels between first and the last panels on the table, two carrier sections
(MSP-MTP, 10) must be used.
7. Align the PV panel correctly and then tighten the screws to a torque of M
Nm using a 6 mm bit or hex key.
8. Subsequent panels are mounted in the same way.
9. The last PV panel in a row must be secured at its outside edge with end clamps
(MSP-EC, 20). Fit the end clamps (MSP-EC, 20) into the carrier sections (MSP-
MTP, 10), slide them into position against the PV panel, align the panel correct-
ly and then tighten the screws securely to a torque of M
bit or hex key.
8. Guide the lower edge of this prepared thin-film panel into the panel middle clamps
(MSP-TF-MC, 23) on the carrier section (MSP-MTP, 10)
9. Fit the middle clamps (MSP-TF-MC, 23) on the top edge of the panel into the
carrier section (MSP-MTP, 10) and tighten the screws slightly using a 6 mm bit
or allenkey so that the nut turns through 90°.
10. Align the panel correctly in its final position. Tighten the lower end middle clamps
to a torque of M
= 15 Nm using a 6 mm bit or allenkey.
d
11. Subsequent panels are mounted in the same way.
12. The outside edge of the panels at the end of a row must be secured with end
clamps (MSP-TF-EC, 21).
* Certified by First Solar.
The clamps (MSP-TF-MC, 23) and (MSP-TF-EC, 21) can thus be used with First
Solar thin-film panels (FS Series 2 laminate panels).
then rotate the cable holder through 90°. Press the cables (max. dia. 8 mm) into
the clips on the cable holders.
= 15 Nm.
d
en
= 15
d
= 15 Nm using a 6 mm
d
11