5.1
1. Position the blocfor™ 20R/30R 150 kg on the console screw (1) then screw the lock nut fully (2)
5.4
5.4
5.6
2. Push the bracket to center it on the cable gland
3. Tighten the square nut
5.6
4.2.2 Installation of the blocfor™ 20R/30R 150 kg assembly and tracrod anchor rod bracket
1. Position the blocfor™ 20R/30R console above the tracrod anchor rod (1).
2. Split the console blocfor™ 20R/30R to the tracrod anchor rod entrainer (2).
3. Check that the console blocfor™ 20R/30R is at the stop of the tracrod anchor rod (3) .check that the
indexer is engaged on the tracrod anchor rod (4)
5.2
équerre
5.4
5.1
5.4
5.6
5.6
NOTICE FIG.6
NOTICE FIG.6
5.3
5.5
5.5
5.5
NOTICE FIG.5
2
2
5.2
équerre
1
1
2
1
5.5
5.7
2
5.7
1
5.7
3
5.7
3
2
2
2
NOTICE FIG.6
5.3
3
3
2
GB
7