Data Output; Measuring Process; Measuring Procedure - Proceq DIGI-SCHMIDT 2000 ND Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4 .10

Data Output

See under "Data Output".
When all the settings have been made on the display
unit, press the END key. The device is ready to continue
with the "Measuring Process".
5

Measuring Process

If necessary, the backlight can be switched on once the
measuring display (see figure 3.1 in chapter 3.2) appears
on the screen. Press the ↑-key for about 3 seconds until
the backlight is on and * appears on the upper right cor-
ner. To switch off the backlight press the ↑-key again for
about 3 seconds.
With the backlight switched on, the energy
consumption is higher.
5 .1

Measuring Procedure

Preferably do perform measurements at tem-
peratures between 10 °C and 50 °C only.
The items in brackets () are illustrated in Fig. 5.6.
12
Measuring Process
Perform test impacts with the concrete test hammer on a
smooth, hard surface, without the cable connected to the
display unit, before taking any measurements which you
are going to evaluate.
Fig. 5.1
Preparing the test surface
Warning!
The impact plunger (1) generates a recoil
when it deploys. Always hold the concrete test
hammer in both hands!
Fig. 5.2
Deploying the impact plunger (1)
• Enter the basic settings as
described under "Settings".
• Use a grindstone to smoothen
the test surface.
• Position the concrete test ham-
mer perpendicular to the test
surface.
• Deploy the impact plunger (1)
by pushing the concrete test
hammer towards the test sur-
face until the pushbutton (6)
springs out.
© 2017 Proceq SA

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Digi-schmidt 2000 ld

Table des Matières