8
FIRST IGNITION
The first ignition must be carried out
by the installer.
8.1
Pellet loading
The pellets must be loaded from a door which
must be provided in the hood of the cladding
and connected to the appliance through the
appropriate accessories (optional), carefully fol-
lowing the assembly instructions.
Do not use the extraction system of the
appliance as a means to load the pellet
hopper.
The use of non-original accessories is
not recommended.
Pellets falling outside the hopper may
damage the operation of the appliance
and cause fires.
The pipe for pellet loading (optional) must act
exclusively as a ramp to fill the hopper of the
appliance and not as an extension of the hopper
itself; avoid loading more pellets than the hopper
can hold.
8.1.1 Optionals available
• Loading system with flexible metal pipe and
loading door (Fig. 46).
• Stand kit (Fig. 47).
• Finishing frames for plasterboard (Fig. 48).
• Combustion air ducting kit (Fig. 49)).
76
Fig. 46
Fig. 47
Fig. 48
Fig. 49
004779216 - 18/09/2024