Télécharger Imprimer la page

Miller Spectrum 2255 Manuel Du Propriétaire page 19

Masquer les pouces Voir aussi pour Spectrum 2255:

Publicité

3-5. Connecting Work Clamp And Gas/Air Supply
2
3
4
From Gas/Air Supply
Rear of
Unit
3-6. Electrical Service Guide
Input Voltage
Input Amperes At Rated Output
Max Recommended Standard Fuse Rating In Amperes
Min Input Conductor Size In AWG/Kcmil
Max Recommended Input Conductor Length In Feet (Meters)
Min Grounding Conductor Size In AWG/Kcmil
Reference: 1999 National Electrical Code (NEC)
1 Consult factory for circuit breaker applications.
2 "Time-Delay" fuses are UL class "RK5" .
3 "Normal Operating" (general purpose – no intentional delay) fuses are UL class "K5" (up to and including 60 amp), and UL class "H" ( 65 amp and
above).
1
5
1
2
Time-Delay
Normal Operating 3
1
Work Clamp
2
Workpiece
Connect work clamp to a clean,
paint-free location on workpiece, as
close to cutting area as possible.
.
Use only clean, dry air with 90
to 150 psi pressure.
3
Gas/Air Inlet Opening
4
Hose
5
Teflon Tape
Obtain hose with 3/8 in (9.5 mm) or
larger diameter and 1/4 NPT right-
hand thread fitting. Wrap threads
with teflon tape (optional) or apply
pipe sealant, and install fitting in
opening. Route hose to gas/air
supply.
Adjust gas/air pressure according
to Section 4-3.
Tools Needed:
5/8, 1-1/8 in
Ref. 802 319-C / 802 201
3080 Model
2255 Model
400
400
23
16
30
20
35
25
12
14
154
154
(47)
(47)
12
14
OM-193 410 Page 15

Publicité

loading

Ce manuel est également adapté pour:

Spectrum 3080