5.8.1 Installation examples
• Through an external wall:
• Across the floor and the stalls:
•
Indirectly through an external wall:
76
5.9 TESTING AND COMMISSIONING
Appliance start-up must be preceded by testing,
which includes an operational check of the
following elements:
• connection to the smoke evacuation system;
• checking that all materials used to build the
smoke duct, flue pipe and chimney pot are
regulation and suitable for use.
The testing is positive only when all operational
phases have been completed without any
anomaly being detected.
5.10 LOCATION OF THE CONFORMITY
LABEL
Fig. 5.11
Fig. 5.12
Fig. 5.13