Télécharger Imprimer la page

Ferroli FORCE W Serie Instructions D'utilisation, D'installation Et D'entretien page 228

Masquer les pouces Voir aussi pour FORCE W Serie:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 254
2.7 Condensate drain connection
IMPORTANT
The boiler has a trap to drain condensate. Proceed as follows for assembly.
1. Secure the trap.
2. Before connecting the hose to the discharge system, fill the trap with water.
3. Connect the hose from the trap to the condensate drain system.
Drains connected to the drainage system must be resistant to acidic condensate.
If the condensate drain is not connected to the waste water drainage system, a neutralizer must be installed.
ATTENTION: THE UNIT MUST NEVER BE OPERATED WITH THE TRAP
B
EMPTY!
OTHERWISE THERE IS A DANGER OF SUFFOCATION DUE TO THE EMIS-
SION OF COMBUSTION FUMES.
THE CONDENSATE DRAIN MUST BE CONNECTED TO THE DRAINAGE SYS-
TEM IN SUCH A WAY THAT THE LIQUID CONTAINED CANNOT FREEZE.
228
0,5lt
fig. 55- Condensate drain connection
cod. 3541Q764 - Rev. 00 - 05/2021
FORCE W
EN

Publicité

loading

Ce manuel est également adapté pour:

Force w 60Force w 80Force w 99Force w 120Force w 150