INDEX
7.3 INSTALLATION INSTRUCTIONS
The anchor bolts must be fitted using the base plates as drilling templates
NOTE: Please refer to the technical specifications provided by the block manufacturer for the block positioning and application methods.
Installation procedure:
- position a column vertically;
- Provide spacers to close any gap under the base plate (fig.B)
- mark out the holes and drill them following the procedures indicated by the block manufacturer;
- fix the block in position;
- bring the other column upright and position it at the distance indicated in ch. 5.2;
- proceed with the drilling and block fixing steps described above for both columns.
Check the anchoring after about ten fully-loaded runs, checking the tightening torque of the bolts.
This inspection must be made every 3 months.
Check again the columns are upright and in the points of shimming there is a proper ground support. (Fig. C).
Ø18
Fig. B
0474-M006-0
SPM32-S
Fig. A
4mm max
Fig. C
EN_17