Télécharger Imprimer la page

Thermador Professional PRO-GRAND PD30 Instructions D'installation page 9

Masquer les pouces Voir aussi pour Professional PRO-GRAND PD30:

Publicité

Les langues disponibles

Les langues disponibles

Step 2
Cabinet Preparation
GAS
AND
ELECTRIC
SUPPLY
ZONES:
FIG. 3A Gas & E_ectrica_ Supply
Zone for Dual Fue_ Ranges
Typical
place-
merit shown.
Other placement
of Gas
Supply
and
Electrical
Receptacle
within
the Elec-
trical
and
Gas
Supply
Zone
is
acceptable.
NOTE:
If not
already
present,
install
gas
shut-off
valve in an eas-
ily
accessible
location.
Make
sure
all users
knowwhere
and
how to shut off
the gas
supply
to the range.
NOTE:
The
in-
staller
should
inform the con-
sumer of the lo-
cation of the gas
shut-off valve.
3/4" Flex Line
to Appliance
240 VAC Receptacle
(Shown)
or Junction
Box
I ",-.
Centerline of
Electrical
I
- Supply Zone
2" Maximum Protru-
sion from Watl for
Gas Supply
Model
A
B
O
D
E
30"
8"
12"
10"
6-1/2"
5ol/4"
36"
10ol/2"
15"
10-1/2"
6-1/2"
5-1/4"
48"
16ol/2"
16"
15ol/2"
6ol/2"
5ol/4"
NOTE:
Any opening
in the wall behind the
appliance
and any opening in the floor under
the appliance
must be sealed.
The
Dual
Fuel
ranges
may be
connected
to the power
supply
with a range supply cord kit or by
hard-wiring
to the power supply.
It is the responsibility
of the in-
staller to provide
the proper wiF
ing components
(cord or conduit
and wires) and complete the elec-
trical connection
as dictated
by
local codes and ordinances,
and/
orthe National Electric Code. The
units must be properly grounded.
Refer to Step 6 for details.
The range
must
be connected
only to the type of gas for which
it is certified.
If the range is to be
connected
to propane
gas, en-
sure that the propane gas supply
tank is equipped with its own high
pressure
regulator
in addition
to
the pressure
regulator
supplied
with the range. (See Step 5.)

Publicité

loading

Ce manuel est également adapté pour:

Professional pro-grand pd36Professional pro-grand pd48