Télécharger Imprimer la page

Health O Meter PROPLUS 2000KL Mode D'emploi page 12

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY INSTRUCTIONS (CONTINUED)
15. Hang the Load Cell Beam Assembly on the two hooks at the end of the Lifter Boom, using the
loops on top of the Load Cell Beam Assembly (see Figure 5, above, for an illustration).
16. Connect the end of the Load Cell Beam Cable coming out of the center of the Load Cell Beam
Assembly to its port on the side of the Lifter Boom.
17 Use the two washers and hexagon shoulder screws to connect the two Stretcher Hoops to the
Load Cell Beam Assembly and tighten well. Make sure the stretcher hooks face in, toward the
stretcher canvas, or inward toward where the patient will be.
18. Insert the stretcher bars into the stretcher channel pockets on either side of the stretcher
canvas, making sure that the stretcher bars pass through the two hanging loops on each side.
Make certain that both ends of the channel pockets are sealed by squeezing the Velcro strips
together.
Note: The hanging loops are tethered to the stretcher fabric. Make certain that each stretcher
bar passes through the portion of the hanging loops with the tether for each side. The other
portion of the hanging loop will go over the hooks of the stretcher hoops.
- 11 -

Publicité

loading