Enclosure Opening - SMA SUNNY HIGHPOWER PEAK1 Instructions D'installation

Masquer les pouces Voir aussi pour SUNNY HIGHPOWER PEAK1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5 Installation
Opening the installation area with two-piece
enclosure lid:
1. Disconnect the inverter.
2. Loosen the three front screws (TX30) on the cover
of the installation area. The screws are captive
screws and cannot fall out.
3. Raise the cover by 180 degrees. A magnet
enables the cover to stay open.
Figure 17: Loosen front screws and lift the cover
4. To close the cover, lower it into place and fasten
the three front screws.

5.7 Enclosure Opening

The mounting brackets for the cable glands are
already pre-mounted.
Figure 18: AC cable gland
26
SHP75-10-STP60-10-IA-xx-19
Figure 19: DC cable gland
Device Type
Terminal Range
SHP 75-10
AC+PE
DC (PV)
STP 60-10
AC+PE
DC (PV)
1)
Observe the ampacity of cables used.
Device Type
Conductor material
SHP 75-10
Al/Cu
Al/Cu
STP 60-10
Al/Cu
Al/Cu
Device Type
Cable sheath diameter with
supplied cable gland
SHP 75-10
46 to 53 mm
18 to 25 mm
STP 60-10
37 to 44 mm
14 to 21 mm
SMA Solar Technology AG
1)
35 to 150 mm²
35 to 150 mm²
16 to 95 mm²
16 to 95 mm²
Installation Guide

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Sunny tripower 60

Table des Matières