SMA SUNNY HIGHPOWER PEAK1 Instructions D'installation page 22

Masquer les pouces Voir aussi pour SUNNY HIGHPOWER PEAK1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5 Installation
Figure 8:
Ensure adequate air fow
Figure 9:
Mount on non-fammable surface
Figure 10: Mount upright on vertical surface A backward
tilt of ten degrees is allowed.
Figure 11: Avoid dust and ammonia gases
INFORMATION
When selecting the installation site, ensure that
the product and warning messages on the
inverter are visible at all times. For details, refer
to Section 9, page 44.
INFORMATION
For information about the operating
temperature range, see Section 9.3, page 46.
INFORMATION
The safety clearances to other objects must be
maintained to ensure sufcient air circulation
(see (see Section 5.3, page 23)).
22
SHP75-10-STP60-10-IA-xx-19
SMA Solar Technology AG
Installation Guide

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Sunny tripower 60

Table des Matières