Télécharger Imprimer la page

Salicru SLC TWIN PRO3/RT3 Mode D'emploi page 209

Publicité

Les langues disponibles

Les langues disponibles

Fig. 46. Parallel connection diagram.
5.3.5.1. Parallel AC wiring.
Wiring length requirement.
1.
When the distance between the load and the parallel UPS is
less than 10 metres, the length difference between the input/
Parallel system model SLC TWIN PRO3.
Fig. 47. SLC TWIN PRO3 parallel system wiring diagram.
Parallel system model SLC TWIN RT3.
Fig. 48. SLC TWIN RT3 parallel system wiring diagram.
USER MANUAL
output lines of the UPS in the parallel system should be less
than 20%.
When the distance between the load and the paralleled UPS
is greater than 20 meters, the length difference between the
input/output lines of the UPS in the parallel system should be
less than 5%.
In a parallel system, the common battery application is not
2.
supported, so the EBMs should be independent and connected
to each UPS.
To configure the parallel system, a qualified operator must
3.
provide assistance.
SLC TWIN PRO3/RT3 4÷10 kVA UNINTERRUPTIBLE POWER SUPPLIES (UPS)
71

Publicité

loading