Télécharger Imprimer la page

Briggs & Stratton 01679-0 Manuel D'installation Et Démarrage page 6

Masquer les pouces Voir aussi pour 01679-0:

Publicité

Les langues disponibles

Les langues disponibles

Figure 3 — Location of Lifting Holes
To lift:
Insert
pipe
here
Installer-supplied pipe
You may also lift the unit using a "hook and hoist" method
attached to the lifting pipes, provided that you use a
spreader bar to ensure that the chains or cables do not
touch the generator's roof.
Retouch any chipped paint with supplied touch-up paint.
After paint is dry, and the unit is in place,.fill the lifting
holes with the supplied lifting hole plugs.
Figure 4 — Enclosure Access Doors
Door Lock
Screw
30"
Briggs & Stratton Power Products Home Generator System
Installation Manual
Fuel
Inlet
42"
6
Access Doors
The Home Generator System is equipped with an
enclosure having four access doors. As shown in Figure 4,
below, the doors are named for a significant component
located behind them. Also shown is the unit's dimensions.
Starting with the side that has the fuel piping connector
and proceeding clockwise, the doors are named:
• Oil Service door
• Air Intake door
• Control Panel door
• Battery door
Each unit is equipped with three identical circular keys.
These keys fit the locks that secure the oil service and
control panel doors.
To remove an access door:
1.
Insert a key into the lock of the access door you wish
to remove and turn one quarter turn clockwise.
NOTE: The key is retained in the lock when the locks are
open.
2.
Grasp the door's lift handle and pull the door upwards
until the security pins are free of the engagement holes
in the lower base.
Exhaust
Port
Door
Lock
Screw
29"

Publicité

loading