Télécharger Imprimer la page

GRE AVANTGARDE Notice De Montage page 27

Masquer les pouces Voir aussi pour AVANTGARDE:

Publicité

First level
Above ground
This is a determining stage in the construction of your pool. Certain works performed in situ, like the preparation of the land, the concrete slab, the
draining... could need the intervention of professionals that will suggest the most adequate solutions.
Select the ideal location, in the sunniest spot possible, taking into account the local regulations (distance from the paths, public rights of way,
networks...) and the landscaping after installing the pool.
Your pool can be installed in these two ways: A-B
Try to not install your pool on recently filled land or unstable land. Whatever type of installation you choose, you should excavate and prepare the
land for levelling.
Attention: in the case that the land is sloping, you need to excavate it for levelling. Do not add soil to level it.
The installation should be using a concrete foundation slab. If a foundation concrete slab is used this should be at least 17 centimetres thick.
The pool is assembled after the concrete foundation slab has completely dried (3 weeks). The filter group should be located below the level
of the pool and ideally at the floor level of the pool.
PARTIAL OR COMPLETELY IN-GROUND INSTALLATION
According to the nature of the land, you should install a peripheral drainage and connect it to a decompression well. The well will be excavated
before the construction of the pool to avoid that the excavations fill with water during the works. It should be near the pool, a few centimetres
lower than the deepest point of the same and reach up to the surface. The decompression well is located at the most humid point. It acts as an
overflow in the case of water infiltrations or clay soil, starting from the fact that water rises quicker through a tube than through the soil.
Natural ground Anti-roots or felt
Geotextile
Layer of stabilized
blanket
gravel
A
Protection and alveolar
draining roll of HDPE
Watertight
Peripheral
film
drainage
Semi in-ground
B
Composite
Draining gravel
frame
ø10-30
Respect the direction of the alveolar
protection roll, with the bubbles against
the wall, to allow the composite to
"breathe".
Descompression
Concrete slab
well
27
EN
In-ground
C
1
2
1- Composite frame
2- Roll of alveolar protec-
tion an drainage of HDPE

Publicité

loading

Ce manuel est également adapté pour:

Kpcor60nKpcor60lnKpcor46nKpcor46nd