Télécharger Imprimer la page

Cooke & Lewis CLGH60ALL Mode D'emploi page 17

Publicité

Installation
EN
Connection to the gas supply
THE CONNECTION TO THE GAS SUPPLY MUST ONLY BE MADE BY A
The connection of the hob to the gas pipe network or gas cylinder must be made by means of a rigid
copper or steel pipe with fittings complying with local regulations.
A connecting elbow is pre-fitted to the hob. This elbow terminates in an external 1/2" BSP connecting
thread complying with ISO 228-1:2003. The connection made to the pre-fitted elbow MUST be suitable
for connecting to this thread. If ANY other connection type or thread size is used a suitable adaptor
MUST be fitted.
The qualified gas installer must ensure that the operation of the burners has been correctly verified
before use.
Adjustment to a different type of gas
CAUTION: Replacement of gas jets must only be carried out by a qualified
NOTE: Extra gas jets are supplied to enable conversion for use with different gas types including liquid
petroleum gas (LPG) butane and propane. Details of the extra jets supplied and their applications can
be found in the Injector Table printed later in this manual. These jets must be replaced using a dedicated
specialist tool, not supplied.
Regulation of burners
CAUTION: The regulation described can only be carried out with burners that use
methane gas and methane/nitrogen blends (where available), and the screw must
be fully tightened in a clockwise direction on burners using LPG.
CAUTION: The Minimum position on the burners MUST be adjusted by a qualified
QUALIFIED GAS INSTALLER
gas installer.
gas engineer only.
17

Publicité

loading