Télécharger Imprimer la page

probst WEZ-06 Instructions D'emploi page 46

Publicité

Les langues disponibles

Les langues disponibles

Operation and Adjustment
When lifting, make sure that the changing
hook (1) can move freely.
Move the lifting eye to the "empty stroke
position" with the help of the carrier (e.g.
excavator).
53100438
1
Fig. 13
Fig. 15
18 / 22
Lift the device with the help of the carrier
(e.g. excavator) with the gripped L-stone (in
the area close to the ground). Then drive
slowly to the installation site and carefully
set down the L-stone.
When lifting the empty device (without L-
stone), the changing hook (1) must be
hooked in again (so that the rubber grippers
stay in opened (fixed) position).
Fig. 14
1
Fig. 16
GB

Publicité

loading