Télécharger Imprimer la page

probst WEZ-06 Instructions D'emploi page 45

Publicité

Les langues disponibles

Les langues disponibles

Operation and Adjustment
5.2.1
Handling
1.) Position the device in the "empty stroke
position" directly above the gripping good.
Make sure that the changing hook (1) is
hooked in.
3.) It is important to make sure that the device
is positioned in the middle of the gripping
good.
53100438
1
Fig. 9
Fig. 11
17 / 22
2.) Lower the device until it rests completely
on the gripping good.
4.) Move the lifting eye to the "load stroke
position" with the help of the carrier (e.g.
excavator).
Fig. 10
Fig. 12
GB

Publicité

loading