• Install a 200 A inline fuse on the positive cables of both batteries.
Fig.
on page 2
4. Remove the three M6 nuts
5. Connect the starting battery positive
6. Install and tighten the three M6 nuts
7.
Loosen the two pin terminal screws.
CAUTION! Damage hazard
To prevent damage to the equipment, the house battery negative must be connected at the end of the in-
stallation.
8. Connect the D+ signal wire to pin
Fig.
on page 3
9.
Tighten the two pin terminal screws.
Note As soon as the ground cable is connected to the battery, it becomes operational.
10. Install the lid and secure it with the two screws.
Display installation
Fig.
on page 3
1.
Slide the bracket down
2. Tilt the bracket away from the display
3. Slide the bracket up
Fig.
on page 4
4. Using the bracket mark the screw holes
5. Drill the screw holes
6. Pull the communication cable through the passage hole
7.
Mount the bracket on the mounting surface using the supplied screws.
Fig.
on page 4
8. Connect the connection cable to the display
9.
Mount the display on the bracket.
Fig.
on page 5
10. Connect the connection cable to the control unit
9 Connecting batteries in parallel
Note To increase the ampere-hour (Ah) capacity, two batteries can be connected in parallel.
Connect the batteries in the following order:
,
, and
.
, all loads
,
, and
and the house battery negative wire to pin
.
.
.
and the cable passage hole
and the cable passage hole
and the house battery positive cables
.
.
both on the mounting surface and the bracket.
.
.
.
.
on the mounting surface.
EN
15