Télécharger Imprimer la page

Automated Production PF-6 Mode D'emploi page 13

Publicité

Photo showing Comlink-2 module connected to a TC5 controller.
Be sure the communication cable is isolated from all high
voltage sources and fluorescent lights. Do not route the
!
communication cable and power cables through the same
electrical knockout. Do not run the communication cable
CAUTION
next to power cables. When crossing power cables, cross
at 90°.
DO NOT GROUND THE SHIELD WIRE!
!
DISCONNECT THE POWER SOURCE BEFORE CONNECT-
ING THE COMMUNICATION CABLE.
CAUTION
5. CONFIGURE THE PF-6'S AS PRIMARY / SLAVE
If your installation requires more than one PF-6 unit for independent
control of different air inlets, one of the PF-6's will be configured as the
primary unit and the others will be configured as slaves. Up to 99 slave
units can be connected in this way. When programming the PF-6's, the
slave units take their reference temperature from the primary unit and
are programmed after the primary unit has determined the next
reference point. The default setting at the factory is SLAVE.
Set internal switch #6 to ON for the primary unit or OFF for a
slave unit. If only one PF-6 unit is used, set dipswitch #6 to ON
position.
Comlink-2
PF-6
PF-6.rev.14
13

Publicité

loading