Télécharger Imprimer la page

Automated Production PF-6 Mode D'emploi page 12

Publicité

PF-6
4. PLUG THE COMLINK-2 IN THE CONTROLLER AND PF-6 UNITS.
a. Unplug EACH UNIT
b. Plug the COMMUNICATION CARD IN the UNIT
Open the cover. Drill a 5/16" hole through the bottom of the controller
and thread the communication cable through the hole. Use the grommet
provided to secure the cable. Connect the cable to the terminals of the
communication card as shown below. When connecting two cable ends
together, solder the joint and use a heat shrink to ensure a proper
contact.
Line-up the module with the connector and insert it in the upright
position (see photo below). For communication, always use a 1 twisted
pair shielded cable. The maximum length of the cable is 3000m and the
recommended wire diameter is 1.0mm. Use a lightning protection module
when running the cable between buildings.
Photo showing Comlink-2 module connected to a PF-6 controller.
Comlink-2
12
PF-6.rev.14

Publicité

loading