13
OPERATION
Only operate the machine when it is in a perfect condition. Before each operation, a visual inspection
of the machine must be carried out. Safety devices and operating elements must be checked carefully.
Check in particular the safety equipment, electrical controls, electric cables and screwed connection
for damage and if tightened properly. Replace any damaged parts before operating the machine.
ZIPPER MASCHINEN GmbH
www.zipper-maschinen.at
ZI-EWB500-AKKU
6.
Step
Install the tray (1) to both struts (6) using a total
of 4 round-head screws (2), 4 washers (3), 4
spring washers (4) and 4 nuts (5).
7.
Step
Hook the front support (1) into the two
longitudinal holes (2) on the frame and move it
forward.
Fix the front support (1) to the tray using a
round-headed screw (3), a washer (4), a spring
washer (5) and a nut (6).
8.
Step
Connect the 6-prong plug to position (1), the 5-
prong plug to position (2) and the 3-prong
plug to position (3).
Assembly completed
OPERATION
25