6.10 CLOSED FIREBOX BOILER FILLING
6.11 FILLING A PUFFER COIL ON THE
SECONDARY CIRCUIT
Make sure the secondary circuit is equipped with its
own correctly sized closed expansion tank.
6.12 CONNECTING THE PROBES
6.13 CONFIGURATION OF DIGITAL
THERMOREGULATOR
6.14 WARNINGS
to safely absorb the heat produced.
36
INSTALLATION
O
N
- 6.12 -