(In case that the fitter chooses install a buffer tank he must connect the remote thermostat to control this tank to the terminals at the rear of the
boiler marked "Termos ambiente (room thermostat)". The boiler does not have an ambient probe, so for correct operation, the installer must
EN
connect an external thermostat to the boiler (0 volts, free of voltage), to regulate its operation.
SANITARY HOT WATER TANK (SHW)
If the boiler has been connected with a SHW tank we have to consider the following requirements:
-
The boiler can only control one SHW tank; in other case it is not guaranteed the correct operation of the boiler in case of replacing this system for
any alternative one.
-
The SHW tank must be equipped with a probe NTC type of 10 kΩ (25-120ºC) with a large inferior to 10 meters with a section of 1 mm
measures the temperature inside the tank and controls the exchange water intake if necessary. For a greater distance, provide a larger section as
well as the shield of the probe to protect it from interferences.
-
Remove the existing bridge connecting the boiler and place the probe.
-
In warm seasons (summer or Autumn) where it is not necessary to simultaneously use the heating and SHW and only the SHW is necessary we
need to programme the display that the system works in "Summer" mode. Then the boiler will only work when there is a demand from the SHW
tank.
-
We have to note that when the boiler works in "Winter" mode the SHW system has preference over the heating circuit.
You should consider that under demand on sanitary water, the boiler will modulate the power, adapting this power to the requests of this
demand to avoid overheating of the primary circuit.
EXTERNAL INPUT/COMMAND CONNECTIONS
The boiler is equipped with a series of connectors, at the rear, to facilitate the connection with different controllers.
External room thermostat.
SHW (Sanitary Hot Water) probe.
3-way motorised valve:
-
"P2" servomotor connexion to activate the heating circuit.
-
"P2" servomotor connexion to activate the SHW circuit.
-
"F" Power supply.
It is important that the thermostats connected are "VOLT FREE"; it means that they cannot carry voltage. Otherwise, the electronic circuit
board of the boiler and some of its components will suffer irreversible damages. Same way, the sanitary water probe should be NTC type
of 10kΩ.

8. STARTUP

The electronic regulation set is very important for energy saving. It is compulsory that the first
commissioning is always done by qualified engineer during the start-up. At the same time, in order to
guarantee an optimal performance, the boiler and its components have to be received in situ by an
authorised specialised technician.
Before connecting the boiler to the mains power, you need to check every point of the following list:
Assembly instructions observation:
-
Has every assembly step been properly done according to the instructions?
Ashtray control:
-
Check we do not find foreign bodies inside the burner. While the boiler is running, no
part or component should be inside the burner or in the hopper. Closes the door and
check that it closes perfectly.
Combustion chamber control
-
Please check that there are no objects inside the combustion chamber and place
inside the chamber the appropriate burner. An incorrect placement of the burner
may cause some problems during lighting and combustion.
INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS
AMBIENT
THERMOSTAT
48
3 WAY
SHW
VALVE
PROBE
P3
P2
that
2
F
HYDROBOREAL

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hydroboreal 23Hydroboreal 27Hydroboreal 23aHydroboreal 27a

Table des Matières