Télécharger Imprimer la page

Kermi IDN10 Instructions D'utilisation Et De Montage page 6

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 7
Check the delivery for completeness and
damage.
Lay out any tools that are required.
Remove the installation protective packag-
ing only at the fastening and connecting
points.
Screw in the vent plugs.
Screw in and tighten the long fastening
screws into the upper sleeves.
Screw in and tighten the short fastening
screws into the lower sleeves.
With auxiliary electrical operation:
Screw out the heating element.
Screw in the T-piece on the side on which
the heating element is to be mounted.
Screw in the heating element and tight-
en it with a torque of 20 Nm.
If appropriate, install any accessories in-
cluded in the scope of delivery, such as a
towel rod, (see separate instructions).
Mount the upper fastenings (see Fig. 10–13)
Mark the drill holes (see Fig. A).
Drill the holes and insert the anchors.
At the wall adapters screw out the securing
screws and pull out the retainers.
Screw on the wall adapters with hexagon
socket screws. Take the position of the drill
hole into account.
Insert the retainers into the wall adapters.
Take the position of the openings into ac-
count.
Only screw on the retainers handtight with
the securing screws. This allows the retain-
ers to still be moved for alignment.
Pre-install the lower spacers (see Fig. 14–15)
Use a knife to cut the two snap-in bolts
at the second marking to the dimension
49 mm.
Install both spacers on the radiator.
Suspend and align the radiator (see Fig. 16–19)
Suspend the radiator via the screws into
the retainers. Ensure that the radiator does
latch in.
In order to align the radiator sideways:
Slide the retainers.
In order to set the wall clearance: Pull out
or push in the retainers.
In order to set the height: Turn the adjust-
ing screw at the retainer.
6
Install the lower spacers and fasten the radia-
tor (see Fig. 20–30)
Turn out the lower spacers until these are
positioned flat at the wall and the radiator
hangs straight.
Tighten the upper securing screws.
Mark the lower drill holes for the spacers.
Press the locking clamp to the rear and
hang out the radiator. Put down the radia-
tor with installed heating element (IDN11)
so that the cable is not bent or damaged.
Drill the holes and insert the anchors at the
lower markings.
Dismantle both spacers.
Screw both snap-in bolts tight.
Suspend the radiator via the screws into
the retainers. Ensure that the radiator does
latch in.
Press on both cover caps and slide them to
the rear.
Press the wall support clips onto both spac-
ers.
Cover the radiator completely with the pro-
tective packaging.
Connection
Connect radiator at water side with com-
mon screw fittings. Observe the max. per-
missible tightening torques of 30 Nm.
Commissioning
Remove the protective packaging com-
pletely before final cleaning or commis-
sioning.
Fill the radiators and vent them using the
bleeding (E). Risk of scalding!
Check the radiator and connections for
leaks.
Electrical connection (with auxiliary electrical
operation)
Have the following activities carried out by
an electrician (in accordance with the sepa-
rate instructions):
Installation and connection of the elec-
trical unit
Connection of the heating element to
the electrical unit

Publicité

loading

Ce manuel est également adapté pour:

Idn11