GCE MEDIUNIT AFNOR Notice D'instructions page 9

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
6.1.4. RECESSED OR EXPOSED COVER INSTALLATION WITHOUT
INSTALLATION BOX
A
N
Place housing (G) into the wall by means of the locking plate (H) and fi x
it with 3 screws (E or others - max. thread size=M5).
Connect TU to the medical gas supply:
Connect radial housing (G1) by soldering the pipe to the pipeline
according to EN ISO 7396-1 standard.
Connect axial housing (G2) by connecting the hose to the axial
connection according to EN ISO 5359 standard.
Fit a quick coupler (D) into the housing (G) and tighten by means of pipe
wrench (tightening torque 12 Nm).
Insert a cover (recessed C2) to the hole or on the wall (exposed C1).
Make sure the CE label is located in right bottom corner.
Fix sleeve (B) to the cover (C). If you have a variant with a lid, assembly
the lid to the sleeve (B2) and fi x by means of the pin (K). (see picture in
Chapter 6.1.3 for details.
Snap the gas specifi c plugs (A) into the sleeve (B) according to the con-
nected gas type. If the gas is indicated by two di erent colours keep the
order of colours from left to right according to EN ISO 9170-1 or national
standard, ex. medical air (AIR) - black-white.
Tighten all by means of the fi xing nut (N) to the QC body (D) with tighten-
ing torque 12 Nm.
B2
C1
C2
B1
9/84
E
D
G
EN
H

Publicité

Table des Matières
loading

Table des Matières