GCE MEDIUNIT AFNOR Notice D'instructions page 11

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
6.1.6. PENDANTS BED HEAD INSTALLATION WITHOUT USE OF
INSTALLATION BOX
B2
A
N
B1
Installation of the Terminal Unit into the pendants - bed head (M) is per-
formed by means of locking plate (H) that is placed on the housing of
the terminal unit (G) and the ready housing is placed in the pendant by
means of the M5 screws (E) - do not fully tighten the screws now.
Connect TU to the medical gas supply:
Connect radial housing (G1) by soldering the pipe to the pipeline
according to EN ISO 7396-1 standard.
Screw the QC (D) into the housing (G) and tighten by means of pipe
wrench (tightening torque 12 Nm).
Drill a hole of Ø65 mm into the sheet of tin (O) and slide it into the pen-
dant (M).
For fi nal securing of the housing, tighten the screws (E) fully.
Insert a cover (recessed C2) to the hole. Make sure the CE label is lo-
cated in right bottom corner.
Fix sleeve (B) to the cover (C). If you have a variant with a lid, assembly
the lid to the sleeve (B2) and fi x by means of the pin (K). (see picture in
Chapter 6.1.3 for details.
Snap the gas specifi c plugs (A) into the sleeve (B) according to the con-
nected gas type. If the gas is indicated by two di erent colours keep the
order of colours from left to right according to EN ISO 9170-1 or national
standard, ex. medical air (AIR) - black-white.
Tighten all by means of the fi xing nut (N) to the QC body (D) with tighten-
ing torque 12 Nm.
O
C
D
11/84
E
M
G
H
EN

Publicité

Table des Matières
loading

Table des Matières