Télécharger Imprimer la page

CAME BKV15AGE Manuel D'installation page 54

Masquer les pouces Voir aussi pour BKV15AGE:

Publicité

Les langues disponibles

Les langues disponibles

Male a hole in the cable gland.
Thread the cables through the cable gland.
Lift the operator by 5-10 mm from the plate by adjusting the threaded feet, to allow for any adjustments that may need to be made between the rack and pinion.
Fastening the rack
1
Release the operator.
2
Rest the rack on the pinion.
3
Weld or fasten the rack to the gate along its entire length.
To assemble the rack modules, use an extra piece and rest it under the joint, then fasten it in place using two clamps.

Publicité

loading