Table des Matières

Publicité

EN
2. FOOT CONTROL
Upon delivery, the foot controls are premounted in the
platform. The mounting of the foot controls is therefore
limited to the following points:
For standard foot controls (S006): lead the electrical
cable from the platform, over the lift arms, to the con-
nection point in the hydraulic power pack or the exte-
rior control box [See Fig. 2.1].
For foot controls with CANNON plugs (S075): connect
the electrical cable with
CANNON plug [1 in Fig.
2.2], premounted in the hydraulic power pack, to the
CANNON plug [2 in Fig. 2.2], premounted on the
platform.
Wire the power supply to the auxiliary control into the
"selection switch" on the control panel of the exterior con-
trol box, according to the wiring diagrams in the attach-
ment [See §1.2].
After connecting the foot controls, test and check
the free clearance of the cable of the foot
controls in all positions of the platform, to
ascertain that it cannot get damaged during the
different movements (open, lower, lift, close) by
the moving parts of the HTL or by the chassis /
body of the vehicle.
DHOLLANDIA
2.1
2.2
2
1
15

Publicité

Table des Matières
loading

Produits Connexes pour Dhollandia ELEC OPTIONS 02

Table des Matières