ProMinent DULCOTEST PER 1-mA-50 ppm Mode D'emploi page 30

Sonde peroxyde d'hydrogène
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Construction and Function
Measurement station When set-up of the measurement station is complete, a two-wire
Measurement station
30
signal cable electrically connects the DULCOMETER
ing and control system for H
the DULCOTEST
The sensor is installed either in the in-line probe housing
DLG III or in the modular in-line probe housing DGM. A sampling
valve (see section 15 Ordering information) can be screwed into the
lower section of the DGM module (see section 8.2 Calibration).
The in-line probe housing is hydraulically connected to the sample
water flow.
Fig. 2
Sample water
entry point
O
, connected to the power supply, to
2
2
®
PER sensor.
H2O2
R?
DULCOMETER
STOP
®
D1C measur-
DULCOMETER
®
D1C H
O
2
2
Two-wire signal
cable
80
60
40
25
l/h
®
DULCOTEST
PER
Sample water
exit point
In-line probe
housing DGMa
Sample
valve
ProMinent
®

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dulcotest per 1-ma-200 ppmDulcotest per 1-ma-2000 ppm

Table des Matières