SCS Sentinel SCS1 STANDARD Manuel D'installation Et D'utilisation page 44

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
MAINTENANCE
Conduct the following operations at least every 6 months. If in high intensity of use,
shorten the period in between.
Disconnect the power supply:
(1) Clean and lubricate the screws, the pins, and the hinge with grease.
(2) Check the fastening points are properly tightened.
(3) Make the wire connection are in good condition.
Connect the power supply:
(1) Check the power adjustments.
(2) Check the function of the manual release.
(3) Check the function of photocells or other safety device.
EN ::: 44

Publicité

Chapitres

Table des Matières
loading

Table des Matières