Control Box; Installation; Before Installation; Pre-Installation - SCS Sentinel SCS1 STANDARD Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN

CONTROL BOX

INSTALLATION

BEFORE INSTALLATION

Decide the installation position of control box first, it is suggested to be installed near
the gate and should be protected from possible damage.
Be aware of the motor cable length before deciding the installation position.

PRE-INSTALLATION

1. Remove the cover by unscrewing the four screws on the cover. See Figure 1(1).
2. Use a screwdriver to puncture the holes beneath the bottom of the control box. See
Figure 1(2).
3. Secure it on the wall. See Figure 1(3).4. Connexion de câblage :
Figure 1(1)
Figure 1(2)
Figure 1(3)
EN ::: 31

Publicité

Chapitres

Table des Matières
loading

Table des Matières